Nuclear Availability Index

How much of the U.S. nuclear fleet is actually producing, as a single number. 100 means the fleet is running flat out; lower means more megawatts offline. Updated every morning, free to cite.
NukeGryd NAI · Oct 16, 2026
82.7
1-day +0.1 7-day -3.0

NAI, last 3 months

The seasonal dips are spring and fall refueling, when utilities take units down in the mild shoulder seasons.

Availability distribution

How many days the fleet ran at each availability level, 2026 to 2026
The fleet sits near 100 most days; the lower-availability bars are the spring and fall refueling seasons, when the biggest supply swings happen. An availability of 96 means 4% of nuclear capacity was offline that day.

Daily availability heatmap

Every day, colored by fleet availability, 2026 to 2026
Lower availability Higher No report
Each cell is one day. Refueling seasons show up as warm vertical bands every spring and fall. Hover a cell for the exact date and availability.

By ISO / region, today

generation as a percent of capacity, lowest first
ISO / RegionAvailabilityMW offlineNuclear capacityUnits
CAISO 49.9 1,122 2,240 2
SPP 60.4 771 1,948 2
IESO (Ontario) Canada 62.0 4,619 12,160 16
ISO-NE 62.9 1,243 3,352 3
SRP 66.7 1,311 3,937 3
Duke Progress 78.9 759 3,593 4
MISO 79.2 2,398 11,512 13
PJM 80.3 6,430 32,692 31
Southern 81.1 1,530 8,080 8
TVA 86.2 1,126 8,181 7
ERCOT 97.8 109 4,986 4
Duke Carolinas 100.0 0 7,226 7
BPA 100.0 0 1,151 1
NYISO 100.0 0 3,329 4
FPL 100.0 0 3,649 4
Dominion SC 100.0 0 977 1

Ontario sits low because several Bruce and Pickering units are in multi-year refurbishment, a planned programme rather than an outage. Its megawatts come from IESO market data, not the NRC status report, and are never added into the U.S. figures on this site. Ontario in detail.

Methodology & citation

The NAI is U.S. nuclear generation divided by available nuclear capacity, expressed as a percent, summed over every operating unit reporting that day. It is the positive framing of "MW offline": an NAI of 96.0 means 4% of the fleet's capacity is offline for refueling, maintenance or a forced outage. Source data is the NRC Daily Power Reactor Status Report and EIA net-summer capacity, updated every morning. It is an availability measure, not a forecast.

The NAI itself is the national U.S. number at the top of this page, and that is what the citation below refers to. The Availability column in the by-market table is the same calculation applied to each fleet separately, so the rows are comparable with one another but none of them is the NAI.

Ontario (IESO) is listed as its own row because it is a market like the others and every column applies to it. Its megawatts come from the IESO Generator Output & Capability Report (MW delivered against rated capability), not the NRC status report, and it is never added into the U.S. figures anywhere on this site. Its availability also runs structurally lower than the U.S. fleet's: several Bruce and Pickering units are in multi-year refurbishment, which is a planned programme rather than a bad day. Ontario in detail.

Cite as: NukeGryd Nuclear Availability Index (NAI), 82.7 as of Oct 16, 2026. NukeGryd, NukeWorker.com.
See the full supply dashboard