NukeGryd
Markets › Organized market

MISO Nuclear Supply

Midcontinent ISO, 13 operating reactors, 11,512 MW installed. Every unit below links to its own operating record.

MISO Today

as of Oct 16, 2026
MW off line
2,398
20.8% of the market's nuclear fleet
Generating now
9,114
of 11,512 MW installed
Units at power
9 / 13
1 derated · 3 off line
Fleet reliability
███

What MISO Itself Reports

the grid operator's own published data, beside ours
Nuclear output, latest reading
9,401 MW
Oct 16, 6:55 PM ET · MISO fuel mix
All generation on outage
69,103 MW
every fuel, Oct 16
Nuclear share of that
3.5%
2,398 MW of it is nuclear, by our count
Forced, all fuels
10,179 MW
planned 36,624 · derated and unplanned 22,300
MISO Multiday Operating Margin report, all fuels, as published Oct 16, 2026. This is the operator's forecast of ALL generation on outage, not a nuclear figure and not ours: it is here to size our nuclear megawatts against the whole stack.

The Generators in MISO

13 units · click any unit for its full record
UnitOwnerStMWPower MW offStatus RecordIndividual Overrun B2B
Callaway Ameren Missouri MO 1,190 0.0% 1,190 RFO ██ ██ ██
Point Beach 1 NextEra Energy WI 589 0.0% 589 RFO ██ ██ ██
Prairie Island 1 Xcel Energy MN 521 0.0% 521 RFO ██ ██ ██
Waterford 3 Entergy LA 1,087 91.0% 98 Derated ██ ██ ██
Grand Gulf 1 Entergy MS 1,397 100.0% — At power ██ ██ ██
Fermi 2 DTE Energy MI 1,141 100.0% — At power ██ ██ ██
Clinton Constellation Energy IL 1,079 100.0% — At power ██ ██ ██
Arkansas Nuclear 2 Entergy AR 982 100.0% — At power ██ ██ ██
River Bend 1 Entergy LA 968 100.0% — At power ██ ██ ██
Arkansas Nuclear 1 Entergy AR 826 100.0% — At power ██ ██ ██
Monticello Xcel Energy MN 617 100.0% — At power ██ ██ ██
Point Beach 2 NextEra Energy WI 597 100.0% — At power ██ ██ ██
Prairie Island 2 Xcel Energy MN 519 100.0% — At power ██ ██ ██
Know which of these units you can rely on Individual · $165/mo

Every reactor scored 0-100 on capacity factor, forced-outage days, streak length, refuel and startup speed, so a published date from a top-decile unit is read differently from one from a bottom-decile unit.

  • Operational Excellence per unit
  • Projected overrun days
  • Breaker-to-breaker streaks
  • Rank within reactor type and cycle length

MISO Outage Pipeline

Individual

When every unit in MISO comes off line next, on one timeline, with the utility's published dates and our projected ones side by side.

See MISO's outage pipeline Individual · $165/mo

The next eighteen months of outages for this market on a single chart, so overlapping refuelings are obvious before they bite.

  • Published + projected start dates
  • MW at stake per outage
  • Confidence on every date
  • Projected overrun days

MISO Fleet Operating Record

Individual

How the 13 reactors in MISO actually run, as a fleet: the average Operational Excellence score, forced-outage days per unit, how many are in a qualifying breaker-to-breaker run, and which unit in this market is the most and least reliable.

MISO This Season

Full seasonal comparison
Fall 2026 average
772 MW
season in progress
Season peak
2,473 MW
on Oct 10
vs Fall 2025
███
Refuels this season
3
3 unplanned events
Stack MISO against every other market Pro · $499/mo

Eighteen months of MW offline, broken out by market and stacked, so you can see whose supply moved and when.

  • Stacked MW-offline history by market
  • Per-market forward curve
  • Ontario as a parallel fleet
  • CSV of any board