ERCOT Nuclear Supply

Electric Reliability Council of Texas, 4 operating reactors, 4,986 MW installed. Every unit below links to its own operating record.

ERCOT Today

as of Oct 16, 2026
MW off line
109
2.2% of the market's nuclear fleet
Generating now
4,877
of 4,986 MW installed
Units at power
3 / 4
1 derated · 0 off line
Fleet reliability
███

What ERCOT Itself Reports

the grid operator's own published data, beside ours
Nuclear output, latest reading
4,904 MW
Oct 16, 7:00 PM ET · ERCOT fuel mix
All generation on outage
26,041 MW
every fuel, Oct 16
Nuclear share of that
0.4%
109 MW of it is nuclear, by our count
ERCOT hourly resource outage capacity, daily peak, all fuels, as published Oct 16, 2026. This is the operator's forecast of ALL generation on outage, not a nuclear figure and not ours: it is here to size our nuclear megawatts against the whole stack.

The Generators in ERCOT

4 units · click any unit for its full record
UnitOwnerStMWPower MW offStatus RecordIndividual Overrun B2B
Comanche Peak 1 Vistra Corp. TX 1,209 91.0% 109 Derated ██ ██ ██
South Texas 1 STP Nuclear Operating TX 1,300 100.0% — At power ██ ██ ██
South Texas 2 STP Nuclear Operating TX 1,280 100.0% — At power ██ ██ ██
Comanche Peak 2 Vistra Corp. TX 1,197 100.0% — At power ██ ██ ██
Know which of these units you can rely on Individual · $165/mo

Every reactor scored 0-100 on capacity factor, forced-outage days, streak length, refuel and startup speed, so a published date from a top-decile unit is read differently from one from a bottom-decile unit.

  • Operational Excellence per unit
  • Projected overrun days
  • Breaker-to-breaker streaks
  • Rank within reactor type and cycle length

ERCOT Outage Pipeline

Individual

When every unit in ERCOT comes off line next, on one timeline, with the utility's published dates and our projected ones side by side.

See ERCOT's outage pipeline Individual · $165/mo

The next eighteen months of outages for this market on a single chart, so overlapping refuelings are obvious before they bite.

  • Published + projected start dates
  • MW at stake per outage
  • Confidence on every date
  • Projected overrun days

ERCOT Fleet Operating Record

Individual

How the 4 reactors in ERCOT actually run, as a fleet: the average Operational Excellence score, forced-outage days per unit, how many are in a qualifying breaker-to-breaker run, and which unit in this market is the most and least reliable.

ERCOT This Season

Full seasonal comparison
Fall 2026 average
11 MW
season in progress
Season peak
339 MW
on Aug 23
vs Fall 2025
███
Refuels this season
0
0 unplanned events
Stack ERCOT against every other market Pro · $499/mo

Eighteen months of MW offline, broken out by market and stacked, so you can see whose supply moved and when.

  • Stacked MW-offline history by market
  • Per-market forward curve
  • Ontario as a parallel fleet
  • CSV of any board